Latest Project

Full Refurbishment, Highfield Rd, SM2

Full Rebushiment to a neglected property.

  • Loft Converison
  • Fully plastered and decorated internally.
  • New flooring and windows
  • Out dated pebbeldashed removed and replaced with k rend
  • Extensive roofing . guttering, tiles replace,lead work.
  • Externel decorating.
  • IMG_20200512_120603IMG_20200512_120633IMG_20200512_151524

Painting and Decorating Campaign, SE27

Working with Mylands Paint to promote their business.

  • Plasterboarding and plastering of Set.
  • Painting of a variety of different colours laid out in set design.

External Refurbishment,Kenlor Road, SW17

Small external rendering and roofing project.

  • Removed existing pebble dash
  • Render aid applied
  • Re-rendered using K-REND
  • New lead,soffit,fascia and guttering work
  • External Decoration

 

External Refurbishment, Ryecroft Road,  SW16

Large external rendering and roof project.

  • Removed existing  pebble dash and roof tiles
  • Render aid applied
  • Re-rendered using K-REND
  • Extensive roof work inc. new tiles ,fascia,guttering , barge board ,lead work
  • External Decoration

External Refurbishment, Salcott Road, Croydon, CR0

Large external rendering project.

  • Removed decades of pebble dashed layers
  • Render aid applied
  • Re-rendered with traditional sand and cement
  • New lead detail, fasica,soffit and guttering change to deep flow
  • Extensive chimney repairs
  • Air bricks and waste pipes updated
  • Rotten wooden mock- tuder beams replaced
  • Full house Decoration

     

External Rendering, Worchester Road, Sutton, SM2

External Rendering and block repair project.

  • Removed cracked and porous render
  • Cracks stiched in brickwork
  • Render aid applied with additional reinforce mesh
  • Re-rendered using  traditional sand and cement
  • Re decorationIMG_0385 (2)

External Rendering, Green Acres Road, Banstead, SM7

External rendering project, using traditional sand and cement.

  • Removed existing pebble dash
  • Render aid applied to bricks
  • Re-rendered
  • Roof repairs
  • Full external decoration

External Rendering, Guildersfield Road, Streatham, SW16

Large external rendering project, using k-rend.

  • Removed existing pebble dash
  • Render aid applied to porous brick-work
  • Re-rendered using k-rend

Before, During and After

External Rendering, Wimbledon Park Road, Wimbledon, SW18

Large external rendering project, using K-rend.

Large External Refurbishment, Worcester Park, KT4

Extensive external work at a large property in Worcester Park.

  • Extensive roof work, including fascia and guttering
  • Extending of roof edge and installing barge boards
  • Chimney stack work, with new lead work
  • New front door moved and installed
  • Existing render removed and re-rendered using K-rend
  • Paint work and landscaping

Before

After

External Rendering and Plastering of Extended Bungalow, South Drive, Banstead, SM7

  • External rendering using sand and cement and stainless steel beading
  • Extenisve internal plastering

External Rendering and Painting, Stamford Primary School, Chilmark Road, Streatham, SW16

  • External rendering using sand and cement and stainless steel beading
  • Painting and Decorating

3 New Builds – Longfellow Road, Worcester Park, KT4

A collection of three 3-bedroom new builds, completed within the 6 week target.

  • Fully plaster boarded
  • Fully skimmed

 

Full Refurbishment of 8 flats – Crystal Palace Park Road, Crystal Palace, SE26

A full re-fit internally of the properties at Crystal Palace Park road

  • Full re-wire and alterations to rooms
  • Fully plastered and decorated
  • New bathrooms and kitchens
  • New floors
  • External repairs and Decorating

 IMG_0412

External and Internal refurbishment of an extended Bungalow, Common field road, Banstead, SM7

  • Extensive prep-work to first fix prior to plaster boarding
  • Insulating plaster board and full re-skim
  • Removal of existing render and Re-render using k-rend

External Refurbishment – Worcester Park, KT4

  • New windows installed
  • K-REND existing brickwork in an off white silicone render

IMG_0383

External Refurbishment – Raynes Park, SW20

  • Existing pebbledash stripped
  • New windows installed
  • Alteration to porch and porch roof
  • New fascia and guttering
  • K-REND in Sterling white silicone render

External rendering on New Builds – Redhill, RH4

  • Two new builds rendered with sand & cement
  • Existing dwelling 3 coat rendered with sand & cement

IMG_0064

Carshalton High School – Floor screed Repairs – SM5

Repairs to the wet rooms sub contracted by ARMFIELD Construction

Garden design – Coulsdon, CR5

  • Large area excavated
  • Foundations laid
  • Built Block walls
  • Tank and Rendered
  • Patio Laid

External Rendering – Wimbledon, SW20

K-Rend extension and property in a white silicone render for a local builder.

If you would like a free quote, complete the below form or call us on 07983007971

FORCE Branding - 9
http://www.checkatrade.com/
krend-logo